Contractors & Developers
PRECONSTRUCTION REQUEST FORM
Preconstruction Request Form (.doc)
Preconstruction Request Form (.pdf)
Asset Tracker Portal: Contractor Guide
Instructions on how to register, log in, view projects, and inspection reports.
BMP Construction Checklists
(updated 3/6/23)
- Construction Review Checklists User Guide
- Infiltration Trench
- Infiltration Basin
- Underground Infiltration
- Bioretention
- Permeable Pavement
- Vegetated Roof
- Seasonal Rainwater Harvesting
- Continuous Rainwater Harvesting
- Rooftop Disconnection
- Bioswale
- Grassed Channel
- Sheet Flow to Grassed Filter Strip
- Sheet Flow to Afforested Filter Strip
- Sheet Flow to Forested Filter Strip
- Sheet Flow to Grassed Open Space
- Sheet Flow to Afforested Open Space
- Sheet Flow to Forested Open Space
- Detention Basin
- Underground Detention
- Filter Systems
- Traditional Constructed Wetland
- Wetland Swale
- Ephemeral Construction Checklist
- Submerged Gravel Wetland
- Wet Pond
- Soil Amendments
- Afforestation
- Urban Tree Planting
BONDING FORMS & INFO
- Bond Memo
- Stormwater Bonding Guidance
- SCD Policy on Bonds (Updated 3/20/24)
- Standard Agreement (Updated 3/20/24)
- Performance Surety Bond Form (Updated 3/20/24)
- Performance Cash Bond Form (Updated 3/20/24)
- Irrevocable Letter of Credit (Performance) (Updated 3/20/24)
- Irrevocable Letter of Credit (Warranty) (Updated 3/20/24)
- Warranty Surety Bond Form (Updated 3/20/24)
- Warranty Cash Bond Form
Certified Construction Reviewer (CCR)
- CCR Application (updated 11/7/2023)
- Additional CCR Application
- CCR Site Review Report
- CCR Policy