Designers
Law & Regulations
Resources
STANDARD PLAN APPLICATIONS
- Residential (less than one acre)
- Residential (greater than one acre)
- Non-Residential (less than one acre)
- Minor Linear Disturbance
- Ag Structure
- BMP and Retrofit
- Bridge and Culvert Replacement
- Demolition
- Sidewalk Trail Linear Impervious
- Stormwater Facility Maintenance
- Tax Ditch
FEE SCHEDULES (Effective 1/1/2021)
PLAN REVIEW
Step 1
Preapplication Meeting Stormwater Assessment Study Checklist
STEP 2
Preliminary Sediment and Stormwater Plan Checklist
Suggestions for Sheet Layouts
Combined Step 2 & 3
Step 3
Sediment & Stormwater Plan Checklist
Sediment & Stormwater Application
Sediment & Stormwater Fee Schedule
POST CONSTRUCTION VERIFICATION CHECKLISTS
- Wet Ponds
- Infiltration Pond
- Dry Detention Ponds
- Bioretention
- Vegetated Channel
- Filter Strips
- Sand Filters
- Underground Storage Facilities
- Afforestation
- Permeable Pavers
- Wetland Swale
- Traditional Constructed Wetland
- Ephemeral Constructed Wetland
Contractors & Developers
BMP Construction Checklists
- 1.0 Infiltration Construction
- 2.0 Bioretention Facility Construction
- 3.0 Permeable Pavement Construction
- 4.0 Vegetated Roof Construction
- 5.0 Rainwater Harvesting Construction
- 7.0 Rooftop Disconnection Construction
- 8.0 Vegetated Channels Construction
- 9.0 Sheet Flow Construction
- 10 A-B Dry Detention Construction
- 10 C Underground Detention Construction
- 11.0 Filtering System
- 12.0 Constructed Wetland
- 12 D Submerged Gravel Wetland Construction
- 13.0 Wet Pond Construction
- 17.0 Afforestation Construction
POLICIES
- (FOIA) Freedom of Information Act
- Electronic Submittal Policy
- Sediment & Stormwater Permit Extension Policy
- Biodegradable Erosion Control Matting
BONDING FORMS & INFO
- Bond Memo
- SCD Policy on Bonds
- Stormwater Bonding Guidance
- Standard Agreement
- Performance Surety Bond Form
- Performance Cash Bond Form
- Irrevocable Letter of Credit
- Warranty Surety Bond Form
- Warranty Irrevocable Letter of Credit Form
- Warranty Cash Bond Form
Certified Construction Reviewer (CCR)
Biosoil